Working together to prevent cable damage

The third party dig process outlines the steps taken by the electrical distribution network operator; UK Power Networks (UKPN) as both concessionaire and statutory undertaker, to work with all Principal Contractors and Tier Two excavation contractors to avoid damage to the Olympic Park electrical network.
17 Oct 2011
Download publication Download publication (1 MB)