Lagoon system for waste water deposition and reuse for road sweeping

The Olympic Delivery Authority (ODA) set a target to minimise potable water use during the construction of the Olympic Park. The construction process also required the dewatering of excavations due to the shallow aquifer. The Logistics team constructed a lagoon system that enabled contractors to discharge their dewaterings into a closed settlement and storage lagoon.
17 Oct 2011
Download publication Download publication (1 MB)