Innovation in timber supply for London 2012

One of the Olympic Delivery Authority’s (ODA’s) objectives was that all timber used would come from known legal and sustainable sources. Following consultation with industry, the ODA put in place innovative methods and processes to ensure delivery of its objective.
The full research paper "Innovation in timber supply at the London 2012 Olympic and Paralympic Games" can be found on the BRE website.
17 Oct 2011
Download publication Download publication (1 MB)