Achieving the Part L target at the Aquatics Centre

The Olympic Delivery Authority’s (ODA) target to exceed 2006 Part L Building Regulations by 15 per cent was not included in the Aquatics Centre’s original design brief, but was instructed at Royal Institute of British Architects (RIBA) Stage C. However the design team successfully incorporated the requirements by focusing on the building systems and fabric improvements.
17 Oct 2011
Download publication Download publication (3 MB)